Executed Projects

To date, we have continuously contributed to the growth of public works in general, especially in the road and infrastructure sectors.

+2,000 km of Road Works

+4,000 m of Bridges

+200 km of 500 kV Transmission Line

+1,000,000 m³ of Ready-Mix Concrete

First Rigid Pavement Project in Paraguay

Industrial Civil Works

Vista aérea 4 torres
500 kV Line — Aerial view of the route over farmland
Torres verticales sobre cultivo
Towers aligned across croplands
Montaje torre con equipo técnico
Tower assembly on site with Ecomipa's technical team
Torres perspectiva
Towers in perspective over rural landscape
Torre y bosque de eucaliptus
Tower bordering a eucalyptus plantation
Línea de torres panorámica
Panoramic view of the full line
Vista larga distancia
Long-distance reach of the line
Torre vista cenital
Overhead view of one of the towers along the route
Montaje vista aérea
Project under construction — aerial view of the assembly

UPGRADE AND MAINTENANCE WORKS ON ROUTE Nº 9 AND ACCESS ROADS

It represents a major road intervention that boosts connectivity and development in the region. This project not only drives tourism, benefiting thousands of residents and visitors, but also contributes significantly to the progress and integration of the Paraguayan Chaco. The construction of a 38-kilometre stretch of paved highway is carried out by Ecomipa S.A., under a subcontract with TOCSA, the main contractor for the Ministry of Public Works and Communications (MOPC).

This stretch includes the installation of culverts, bridges, access roads to rural properties and connections between main highways, as well as horizontal and vertical signage, shoulders, safety barriers, and maintenance of the existing road.

Additionally, the project comprises the construction of a toll station, a roundabout in the city of Pozo Colorado, and the creation of an access road to the Gral. Díaz junction. These facilities are designed to improve traffic flow and road safety.

The works, carried out by Ecomipa S.A., have been executed following the highest quality standards, respecting the environment and current technical regulations, and have involved qualified Paraguayan labour for over 36 months.

SAN PEDRO PROJECT

 

 

 

ALBERDI - PILAR PROJECT

 

 

 

EXPORT CORRIDORS PROJECT